HEG-EB50.0

Heger Energy Booster HEG-EB50.0
for biomass boiler 4.800 kW

Key data:

  • Smooth tube heat exchanger with heat exchanger tubes made of stainless steel 1.4571
  • Casing Ø 1600, head part as well as cleaning cover made of stainless steel 1.4571
  • Bypass switch with connection to the existing fluegas system
  • Heat output of heat exchanger 644 kW (M50, 60°C RL)
  • Insulation of heat recovery system and flue gas piping
  • Continuous flue gas measurement
  • MSR-technology for monitoring plant control by SPS
  • Engineering (Process engineering & design)
  • Operational documentation
  • Assembly & delivery
  • Start up & training

CONCLUSION - FINDINGS

  • EnergyBooster is reliable during the whole heating season (without cleaning)
  • No noticeable increase in pressure loss
  • Hardly any reduction in performance noticeable
  • Stainless steel design has proven itself considering the condensation occuring during start-up and shut-down
  • If the electrostatic precipitator is connected, cleaning at the end of the season is sufficient