Heat recovery system for gas boiler
A heat recovery system from HEGER was installed to use the waste heat from a gas burner (10MW). This gives us additional energy.
Key data:
- Heat recovery system HEG-C-1000-Sonder
- 2-stage heat exchanger ECO and CONDENSER
with tubes made of stainless steel 1.4571
Heat output ECO & CONDENSER 1.150 kW - Housing parts made of stainless steel 1.4571
- Connection to the exisiting flue gas system
including bypass switch - Control technology
- Control cabinet, automation
- Assembly & delivery
- Engineering (procedural layout, design, flow optimisation)
- Startup
- Place of installation: AUSTRIA